PRODUCT CATEGORY
CONTACT US
YUEQING BETRE AUTOMATION CO.,LTD. Add:Baishi Industrial, Yueqing, Zhejiang, CN Contact Person: Betre H Tel:+86-577-61712130 Fax:+86-577-61712160 Email:betre@betre.cc MSN:betreauto@hotmail.com SKYPE:betreauto
Skype: skype
  
lefg-bottom

ZPT10~16DN A5/A6

ZPT10~16DN A5/A6
ZPT10~16DN A5/A6
Vertical Vacuum Entry Without Buffer Vacuum Pad Series ZPT
ZPT10~16DN A5/A6
Ordering Information

How to Replace


Since pads are essentially rubber, deterioration is unavoidable. The rate of deterioration depends upon factors such as conditions of use environment and temperature. Regular maintenance should be performed. If any damage, splitting, cracking or abrasion has occurred in a pad which appears to be harmful, replace it immediately. Also, take care not to damage the outside surface of the pad.
1. Pull the lock ring upward, and after lifting it to the adaptor, remove the old pad by pulling it downward.
2. While holding the lock ring in the raised position, place a new pad onto the adaptor.
3. Confirm that the pad is securely in place, and then return the lock ring to its original position.
吸盘属于橡胶件,老化是不可避免的。老化的速度取决于因素的使用方法、环境和温度等条件。应进行定期保养。如果发生任何损害、分裂、开裂或磨损等情况,应立即更换。更换时请不要磨损吸盘的外表面。
1. 向上扣出锁环,脱离适配器。
2. 将适配器拉出旧的吸盘
3. 扣出的锁环套上新的吸盘,确认吸盘固定到位,然后再插入适配器。
Dimension

ADD TO ENQUIRY
Prev:ZPT10~16CS A5/A6 Next:ZPT10~16DS A5/A6